Transmission Scoping*

Adding 3 circuits at 2 mile long each (69kV and 132kV)

Using Leading Alternative Transmission Software

The client previously had the following timeline:

  1. Preliminary survey: 1-day travel + 2-day survey

  2. Design the area: 14 days

  3. Redesign after customer feedback: 7 days

Average total time for design: approximately 24 days

 

Using Power Lines Pro

After introducing PLP, the client's new timeline is as follows:

Preliminary survey: 1-day travel + 2-day survey

Design entire model: 4 days

Redesign after customer feedback: 1 day

Average total time for design: approximately 8 days

Outcome

  • 3x faster to complete designs using PLP

  • ⅔ labour cost reduction for personnel on the project

 

The visualisation in PLP and extensive reporting tools helped stakeholders achieve a better understanding of the design. 

*Power Lines Pro can conduct both transmission & distribution scoping projects.

Scoping Project Case Study

CONTACT US OR SEE FOR YOURSELF!

PRODUCT

RESOURCES

COMPANY

Power Lines Pro

LineSoft Pty. Ltd. 

ABN: 84 6066 33443

Copyright 2020 LineSoft Pty Ltd.

All Rights Reserved